New Posts  All Forums:

Posts by rockmedic109

Dang finger farts. Add to last post... ....need some pointers.
grrrrrrrrrrrrrrrr...... Apology accepted. I'd like a list of things that need to be done to get the machine up and running right {or better}. Us dorks without computer knowledge
Phase 2 for 18 days here too. Ordered a 5500. But the expected ship date when you configure a system now is much sooner than the original I was given. Hoping to have something new and warm in my lap soon.
I ordered mine on 11-22 with a 12-26-05 ship date on order. Last week, the expected ship dates were 12-19, so I am hoping the earlier estimates are got revised. Still only showing Phase 2, however.....
Had that problem with my refurbished Toshiba {new 5500 is on order}. The AC power-in plug was not real tight and allowed a disruption of power when jostled. Not a problem when the battery is in. I hope this is all it is.
I was dabating on a m5500 or a Sager 5320. The Alienware was about $60 more. The Alienware has a switch between the Intel graphix and the Nvidia 6600 which I figure is worth a few dollrs more {the on-board graphics can take over...
Got it the first day it came out. I don't like shooters, but it was fun for a while. Good graphics. Totally unrealistic, but still fun. Was a little shorter induration than most games I have.
"anencephalics" I love it! Though I prefer the prefix fecal-. I'm listed as phase 2, but I ordered my m5500 the day before yesterday and the expected ship date is Dec 26. FedEx shipping is 2-5 days, but this is...
When I get my new 5500, I'll post the results if someone tells me how to get and run the test. Ordered it last night, so it'll be a month or so before it shows up.
The new 5320 has a 533FSB. The 7620 {which I have been looking at} has a 800FSB. How much performance loss is there between a 533 and and 800 FSB?
New Posts  All Forums: