So I just got a Lenovo Yoga 13. This is my review.
As what I primarily do is writing and programming, having a good keyboard is critical for me, which is why a tablet alone can’t work for me, and...
I have owned dozens of laptops in a variety of brands, and had many different laptops provided for my use at work. Without question, this is the finest I have owned. The Alienware M17x R2 is a...
Lenovo Thinkpad W530 Review
by Djembe
One of the longest and most enduring brands in computers is Thinkpad. Originally developed by IBM in the USA, Thinkpad notebook computers are now...
I too changed my order to get the Airgo card but I was assured that it wouldn't delay my order. I may have been duped! I can't live without a computer for much longer.
[1] Aurora™ m9700
Processor: AMD Turion™ 64 Mobile ML44 2.4GHz 800MHz FSB 1MB L2 Cache
Operating System (Office software not included): Genuine Microsoft® Windows® XP Media Center Edition 2005 with Service Pack 2
Display: 17" WideUXGA 1920 x 1200 LCD with Clearview Technology
Memory: 2GB Dual Channel DDR SO-DIMM at 400MHz - 2 x 1024MB
Hard Drive: Extreme Performance (RAID 0) - 160GB (80GB x 2) 7200 RPM SATA with NCQ
Optical Drive: 8X Dual Layer DVD+/-RW / 24X CD-RW Combo w/Software
Video/Graphics Card: Dual 256MB NVidia® GeForce™ Go 7900 GS - SLI Enabled
Let's Hope! Ijust got off the phone and they said that once my money is in thier hands it will go right into production, and that all the parts are in stock. Funny thing is that they have had all of my money since last Friday.
[1] Aurora™ m9700
Processor: AMD Turion™ 64 Mobile ML44 2.4GHz 800MHz FSB 1MB L2 Cache
Operating System (Office software not included): Genuine Microsoft® Windows® XP Media Center Edition 2005 with Service Pack 2
Display: 17" WideUXGA 1920 x 1200 LCD with Clearview Technology
Memory: 2GB Dual Channel DDR SO-DIMM at 400MHz - 2 x 1024MB
Hard Drive: Extreme Performance (RAID 0) - 160GB (80GB x 2) 7200 RPM SATA with NCQ
Optical Drive: 8X Dual Layer DVD+/-RW / 24X CD-RW Combo w/Software
Video/Graphics Card: Dual 256MB NVidia® GeForce™ Go 7900 GS - SLI Enabled
According to the status website I have hit Phase 8!!! WHOOHOO!!
10:45 am: Update... I talked with Grace in CS today. She said that the order status site should be running better and updating the way it should be now. With that said, there is a chance that my system could ship out tomorrow!
HOLY **** I was just checking the website and it said i was in phase 4...the building part of w/e...was kind of bumed about that. I decided to call them...turns out I am in phase 8! OH SNAP WOOOO I am about to piss myself
I would think only a couple of days since it is coming from Miami. Not too long I think... Mine has to go from Miami to Minneapolis, MN... it'll be a 3 day hike for me....