New Posts  All Forums:Forum Nav:

area-51 m9750

post #1 of 25
Thread Starter 
orderd a few days ago
currently in phase 4!! the screen will take a while though so i have abot 30 more days to wait


[1] Area-51® m9750

Processor: Intel® Core™ 2 Duo Processor T7200 2.0GHz 4MB Cache 667MHz FSB
Operating System (Office software not included): Genuine Windows® Vista Home Premium - With USB Mini Media Center Remote Control and Single NTSC TV Tuner
Chassis: 17" WideXGA+ 1440 x 900 LCD - Stealth Black
Memory: 2GB Dual Channel DDR2 SO-DIMM at 667MHz - 2 x 1024MB
System Drive: Single Drive Configuration - 80GB Serial ATA 1.5Gb/s 5,400 RPM w/ NCQ & 8MB Cache
Primary CD ROM/DVD ROM: 24x DVD-ROM/CD-RW Burner w/ Nero Software
Video/Graphics Card: 512MB NVidia® GeForce™ Go 7950 GTX
Wireless Network Card: Internal Intel® PRO Wireless 3945 a/b/g Mini-Card
Sound Card: High-Definition Audio with surround sound
Warranty: 1-Year AlienCare Toll-Free 24/7 Phone Support w/ Onsite Service
Mobile Bags: Alienware® Odyssey Briefcase
Alienware Extras: Alienware® Mesh Cap
Alienware Extras: Alienware® Mousepad
Alienware Extras: AlienInspection - Exclusive Integration and Inspection - $100 Value - FREE!
post #2 of 25
Great buy, especially at that price.

You'll probably be in phase 4 for a while though, I'm in phase 4 and I ordered about three weeks ago (april 3rd)
post #3 of 25
Yeah Congrats, great machine, and nice config. Yeah you'll be stuck in phase 4 for a little bit like what TbbZz said
post #4 of 25
I've also ben in phase 4 for, well, a few weeks.
post #5 of 25
Phase 4 here as well. Good times were had by all.
post #6 of 25
Thread Starter 
thanks, sucks that il be in stage 4 for so long, the site said it would be 28 days, the day that i orderd, how long do you guys think itl be after the 28 days are up
post #7 of 25
as soon as you get you m9750 plz write a detailed review with plenty of picks plz.ty
post #8 of 25
Weird mine just went back to phase 3...
post #9 of 25
just to "brace" everyone. i was one who preordered the m9700 when that was the latest hotness, took 3 months to ship. not saying thats whats going to happen here, but perfection takes time
post #10 of 25
Quote:
Originally Posted by TbbZz
Weird mine just went back to phase 3...
That's normal Expect a jump into the production phases, maybe even the test phases, in a day or so.
post #11 of 25
Mine went back to phase 3 as well...

Odd.
post #12 of 25
Anyone know how long phase 6 takes? I've been in it for 4 days, today is the 5th.
post #13 of 25
Ordered mine 3 days ago.. In P4 already :-) I cant freggin wait..
post #14 of 25
Thread Starter 
just an update, its now been more than a month and still in p4, aw rep told me that it is on schedule and should ship by the 31st
post #15 of 25
has anyones m9750 ship yet?
post #16 of 25
Nope
post #17 of 25
Phase four here as well. Lets just hope to god it comes out on time
post #18 of 25
Spoke to a rep this week and she told me that they are not even sure that July 3rd is the release date. I originally ordered the 9750 but then changed to the mALX when I talked with the rep in late May and she was telling me it could be July/August. So I decided to order the mALX, because it is an awesome gaming machine and also because I already have a Dell M1210 Pentium Core Duo, so I felt the wait and the duplication in a llarger form of a sysytem I already have wasn't necessary.
post #19 of 25
Thread Starter 
i just checked and im back to phase 3, whats up with that?
post #20 of 25
is the m9750 delayed till August ?
New Posts  All Forums:Forum Nav:
  Return Home
  Back to Forum: Alienware Phases