Just jumpped from 6 to 8 today.. yay!!
PROGRESS METER
Phaze 1: Order Confirmation : 5/11/07 (Morning)
Phaze 2: Billing/Finance : 5/11/07 (Night)
Phaze 3: Payment Processed : 5/13/2007 (Night)
Phaze 4: Pre-Production : 5/14/2007 (Morning)
Phaze 5: Assembly : 6/28/07 (Morning)
Phaze 6: Integration : 6/28/07 (Noon)
Phaze 7: System Testing : 07/03/2007 (Morning)
Phaze 8: Quality Control/Shipping Prep : 07/03/2007 (Noon)
Phaze 9: Order Ship
Phase 8: (Production Phase 4 - Quality Control/Shipping Prep)
The system is undergoing the final stage of the Alienware 200-Point Quality Control Process. An Alienware Quality Inspector is in charge of inspecting your system from top to bottom for any obvious or latent defects. Our Inspectors are seasoned technicians/engineers and are very experienced in the art of perfection. Note: If the system does not pass any of our performance standards, the system may have to go back to an earlier production phase and it may slightly delay your order.
PROGRESS METER
Phaze 1: Order Confirmation : 5/11/07 (Morning)
Phaze 2: Billing/Finance : 5/11/07 (Night)
Phaze 3: Payment Processed : 5/13/2007 (Night)
Phaze 4: Pre-Production : 5/14/2007 (Morning)
Phaze 5: Assembly : 6/28/07 (Morning)
Phaze 6: Integration : 6/28/07 (Noon)
Phaze 7: System Testing : 07/03/2007 (Morning)
Phaze 8: Quality Control/Shipping Prep : 07/03/2007 (Noon)
Phaze 9: Order Ship
Phase 8: (Production Phase 4 - Quality Control/Shipping Prep)
The system is undergoing the final stage of the Alienware 200-Point Quality Control Process. An Alienware Quality Inspector is in charge of inspecting your system from top to bottom for any obvious or latent defects. Our Inspectors are seasoned technicians/engineers and are very experienced in the art of perfection. Note: If the system does not pass any of our performance standards, the system may have to go back to an earlier production phase and it may slightly delay your order.