Bumped up from phase 6 to Phase 8 This Afternoon
PROGRESS METER
Phaze 1: Order Confirmation : 5/11/07 (Morning)
Phaze 2: Billing/Finance : 5/11/07 (Night)
Phaze 3: Payment Processed : 5/13/2007 (Night)
Phaze 4: Pre-Production : 5/14/2007 (Morning)
Phaze 5: Assembly : 6/28/07 (Morning)
Phaze 6: Integration : 6/28/07 (Noon)
Phaze 7: System Testing : 07/03/2007 (Morning)
Phaze 8: Quality Control/Shipping Prep : 07/03/2007 (Noon)
Phaze 9: Order Ship
Phase 8: (Production Phase 4 - Quality Control/Shipping Prep)
The system is undergoing the final stage of the Alienware 200-Point Quality Control Process. An Alienware Quality Inspector is in charge of inspecting your system from top to bottom for any obvious or latent defects. Our Inspectors are seasoned technicians/engineers and are very experienced in the art of perfection. Note: If the system does not pass any of our performance standards, the system may have to go back to an earlier production phase and it may slightly delay your order.