I got my 5670 about a week ago... I picked it up directly from Sager but bought it at PC Torque (Thanks Adam!). Anyhow, my story is long... I purchased from a different company the equivalent to the 5660 about 2.5 weeks ago with the 2.8 CPU, UXGA etc.
When I found out that the 5670 came out, I immediately returned the 5660 being that it was within the 15 day 'no questions asked' refund policy. I wont mention the company I got it from as it is not relevant... They are very good too and I actually had 2 5660's... The first one I got had a bunk screen, no dead pixels but you could see white light coming out of the left upper side of the screen, it really looked bad against a black background. It was replaced for a brand new unit. When I went down to exchange the 5660 (April 4th, 2003), I asked everyone who worked there when the 'new' 5660 was coming out with the 3.06 HT and 128MB vid card. NO ONE knew anything about it, or so they said...
The next day I see the thread here about the 5670 shipping that very next Monday! I was pissed! I called the place where I got the 5660 and returned it, they were great and said that they would have done the same thing. I would have bought the 5670 from them as well but they didn't know when they would be 'ready'. I told them that Sager was already shipping them, what is the holdup? I was told that the units were still in 'testing'. I thought WTF? Doesnt Clevo test the damn things before THEY release them?
They could not give me a date on when I could receive the 5670 and I had to have it this week as I am going away in 2 days and I knew I had to install everything etc. So, I gave Adam a call, on Wed the 6th and ordered my 5670 but told him I wanted to pick it up directly from Sager and that yes I will pay the tax, can't wait (literally) for it to ship to PC Torque then back to me. I ordered the thing Wed at 6PM PST, so it was 9PM at PC Torque. Adam said it wouldn't be ready til Friday (2 days later) and I said, 'cool'.
Tony from Sager called me at 2PM on THURSDAY to say, 'it's ready'! Hows that for service! Friday morning I picked it up, installed everything, and I could not be happier! This is a beautiful machine that, except for the intake fans, looks identical to the 5660 it replaced.
Mine has the following specs:
3.06 HT
UXGA
128MB 9000 (Don't all 5670's?)
Dual Battery
60 Gig 5400
512 MB Ram
DVD/CD-RW
I gotta say the HT (at least for me) makes a HUGE difference. I do web design/graphics (lots of photoshop) and the 3.06 HT feels MUCH faster than the 2.8 I had. Don't really notice much difference between the 64MB and the 128MB vid card though. The UXGA screens are truely remakable, by far the best laptop screen I have EVER seen. If you set up XP Pro the right way with fonts and icons and such, they don't look too small, not for me anyway.
Well that's my story, hope I don't bore anyone...
When I found out that the 5670 came out, I immediately returned the 5660 being that it was within the 15 day 'no questions asked' refund policy. I wont mention the company I got it from as it is not relevant... They are very good too and I actually had 2 5660's... The first one I got had a bunk screen, no dead pixels but you could see white light coming out of the left upper side of the screen, it really looked bad against a black background. It was replaced for a brand new unit. When I went down to exchange the 5660 (April 4th, 2003), I asked everyone who worked there when the 'new' 5660 was coming out with the 3.06 HT and 128MB vid card. NO ONE knew anything about it, or so they said...
The next day I see the thread here about the 5670 shipping that very next Monday! I was pissed! I called the place where I got the 5660 and returned it, they were great and said that they would have done the same thing. I would have bought the 5670 from them as well but they didn't know when they would be 'ready'. I told them that Sager was already shipping them, what is the holdup? I was told that the units were still in 'testing'. I thought WTF? Doesnt Clevo test the damn things before THEY release them?
They could not give me a date on when I could receive the 5670 and I had to have it this week as I am going away in 2 days and I knew I had to install everything etc. So, I gave Adam a call, on Wed the 6th and ordered my 5670 but told him I wanted to pick it up directly from Sager and that yes I will pay the tax, can't wait (literally) for it to ship to PC Torque then back to me. I ordered the thing Wed at 6PM PST, so it was 9PM at PC Torque. Adam said it wouldn't be ready til Friday (2 days later) and I said, 'cool'.
Tony from Sager called me at 2PM on THURSDAY to say, 'it's ready'! Hows that for service! Friday morning I picked it up, installed everything, and I could not be happier! This is a beautiful machine that, except for the intake fans, looks identical to the 5660 it replaced.
Mine has the following specs:
3.06 HT
UXGA
128MB 9000 (Don't all 5670's?)
Dual Battery
60 Gig 5400
512 MB Ram
DVD/CD-RW
I gotta say the HT (at least for me) makes a HUGE difference. I do web design/graphics (lots of photoshop) and the 3.06 HT feels MUCH faster than the 2.8 I had. Don't really notice much difference between the 64MB and the 128MB vid card though. The UXGA screens are truely remakable, by far the best laptop screen I have EVER seen. If you set up XP Pro the right way with fonts and icons and such, they don't look too small, not for me anyway.
Well that's my story, hope I don't bore anyone...






do I post links in a message) 

).

