NotebookForums.com › Forums › Notebook Manufacturers › Alienware Notebook Forums › Alienware Phases › Custom build 5300 SFF in less than a week
New Posts  All Forums:Forum Nav:

Custom build 5300 SFF in less than a week

post #1 of 3
Thread Starter 
Wow, what a difference a few months makes!

I ordered a second Area-51 5300 SFF for my home office - the build time was 4 working days compared to 6 weeks on my first unit. Hopefully everything on this order will run as flawlessly as the first.

Phasers:
05/11/05 Phase 1 - Ordered (After hours)
05/12/05 Modified order configuration via phone
05/12/05 Phases 2-3
05/13/05 Phases 4-9
05/16/05 Phases 10-12
05/17/05 Phases 13-14 Shipped!


Area-51® 5300
Operating System: Microsoft® Windows® XP Professional with Service Pack 2
AlienRespawn: Alienware® Respawn Recovery Kit
Chassis: Alienware® Area-51 5300 Small Form Factor Chassis - Black
Processor: Intel® Pentium® 4 Processor 550 w/ HT Technology 3.6GHz 1MB Cache
Motherboard: Alienware® Area-51 5300 Motherboard with Intel® 915G Chipset
Memory: 1GB Dual Channel DDR PC-3200 at 400MHz - 2 x 512MB
Graphics Processor: NVIDIA® GeForce™ 6800 GT PCI Express 256MB DDR3 w/Digital and S-Video Out
System Drive: High Performance - Serial ATA - 250GB Seagate® Barracuda 7,200 RPM w/8MB Cache
Optical Drive: NEC® ND-3500 16x Dual Layer DVD±R/W Recorder
Sound Card: Intel® 6-Channel Audio with SPDIF and Composite Out
Network Connection: Integrated High Performance Gigabit Ethernet
Display One: Alienware® 20.1" LCD Display
Speakers: Klipsch ProMedia™ GMX A-2.1 Speakers
Keyboard: Microsoft® Multimedia Keyboard - Space Black
Mouse: Microsoft® IntelliMouse Explorer 3.0 - USB
Free Alienware Mousepad: Free Alienware® Mousepad
AlienInspection: AlienInspection - Exclusive Integration and Inspection - $99.99 Value - FREE!

Special Financing Offer; 90 Days Same As Cash Financing
$400 Mail-In Rebate
Free Shipping; $99 Mail-In Rebate for Free Shipping


Props to Christina and Susan at AW for helping me fix my order by getting the right optical drive added!

Thanks to all at AW!
post #2 of 3
Yeah, they must like the month of May because i ordered my 7700 on 5/13/05, and its on phase 13 right now on 5/18/05.

I guess all the stuff i ordered is coming in 5 different boxes. Pics when i recieve it will be posted
post #3 of 3
Thread Starter 
I'm twiddling thumbs waiting for the shipment to arrive by ground. It looks like it's going to take longer to deliver than to build!
New Posts  All Forums:Forum Nav:
  Return Home
  Back to Forum: Alienware Phases
NotebookForums.com › Forums › Notebook Manufacturers › Alienware Notebook Forums › Alienware Phases › Custom build 5300 SFF in less than a week